
HomeServicesConcrete PatiosKing
Concrete Patios in King Township
My Concrete Pros pours concrete patios across King Township, from rural patios off estate and country homes to backyard pours on village lots in King City, Nobleton and Schomberg. Most of King sits on the sand and gravel of the Oak Ridges Moraine, which drains fast but can wash out or settle under a slab, so we contain and compact the base before we pour. Quotes are free and written, and the labour carries a lifetime warranty.
Get a straight quote
Free · no pressure · 1 business day
Reviewed June 2026
Every job is priced individually, not off a price list. Tell us about yours and you get an accurate, no-pressure quote in writing.
A patio in King Township starts with the ground, and King ground is not like the rest of York Region. Most of the township sits on the Oak Ridges Moraine, a long ridge of glacial sand and gravel. Water soaks straight down through it instead of sitting in clay. That makes frost heave less of a worry, but loose sand under a slab can settle or wash out if the base is not built right.
Our full patio method is on the concrete patios page: 32 MPa air-entrained concrete for freeze-thaw winters, a compacted granular base, and a slope of about 2 percent away from the house. This page covers what King's sand, its big rural lots and its older farmhouses change about that job.
Moraine sand: contain the base, then compact it
On clay, the usual patio problem is water held under the slab that freezes and lifts it. On King's moraine sand, the problem is the other way round. The sand drains well, but it moves. If the edges are not held and the base is not packed, the sand under the outer edge of the patio can settle or wash away, and the slab cracks or tips.
So on a King patio we dig out the soft topsoil, build up a compacted granular base, and hold the edges so the sand stays put. Then we set the surface slope so rain sheds off the patio, not into the sand along its edge. Out toward the Holland Marsh the ground is soft, wet organic soil, not sand, and it needs its own approach. We check which ground you have on the site visit, before we quote.
Rural patios on estate and farm lots
Many King homes sit well back from the road on large acreages, and a patio off a country home is often bigger and further from the driveway than a suburban one. Access for the concrete truck is part of the plan. We walk the route from the road to the patio on the site visit and plan how the concrete gets there before we give you a number.
A walkway to the door poured the same day as the patio shares the truck and the base crew. If the patio is going decorative, see stamped and decorative concrete in King Township for the patterns and finishes on King's ground.
Village lots: check the hard-surface limit before you size the patio
If your home is in one of King's villages, there is a rule to check before you draw the patio. The Township's Site Alteration By-law now says a residential lot with a single-detached or semi-detached house in the Villages may not have more than 60 per cent hard landscaping, calculated across the whole lot. Townhouse lots are held to 80 per cent. A patio is paved surface, so on a smaller village lot it counts toward how much hard surface the property already carries, together with the driveway and walkways.
The Township also has an exemption route. It asks for a stamped grading and drainage plan and a stormwater evaluation from a qualified professional, and it does not replace a minor variance. Ask King's building and engineering staff how your lot counts and which rule applies to your address before you settle on a patio size.
Older farmhouses: keep the water off the wall
Many King farmhouses and century homes have foundations built before walls were sealed to today's standard. A patio poured against one of those walls must slope away from it, or it sends every rain and every spring melt straight to the foundation. We check where the downspouts empty and whether the ground already runs toward the house.
If the basement already lets water in, we tell you before we pour, and we can look at basement waterproofing in King first, so the patio does not go in on top of the problem.
How a King patio job runs, start to finish
The site visit comes first. We look at the ground (moraine sand, or softer ground nearer the Holland Marsh), the route a concrete truck would take, where the downspouts empty, and how the yard falls. You get measurements, the finish options and a free written quote, with no deposit to get a price.
On pour day, the soft topsoil comes out and the granular base goes in and is compacted. The edges are held so the sand cannot slump, forms are set to give the slope away from the house, and the concrete goes in and is finished.
After the pour, the lifetime warranty on labour covers our site preparation, base, pour and finishing. Hairline cosmetic cracks and use before cure against our guidance are not covered, and materials carry their manufacturers' warranties.
King is a planned trip, so book ahead
King sits well north of our home routes, so we book township jobs into planned trips with dates set in advance, not a same-week promise. Ask for the quote in spring if you want the patio ready for summer. We reply to every request within one business day.
Straight answers
My King lot is all sand. Is that good or bad for a patio?
Both. Moraine sand drains fast, so water is less likely to freeze under the slab and lift it. But loose sand can settle or wash out under the edges. We contain the edges, compact a granular base, and slope the surface so rain runs off the patio, not into the sand beside it.
We live near the Holland Marsh. Is the job different?
Yes. The ground out by the Holland Marsh is soft, wet organic soil, not moraine sand. We look at the ground on your lot on the site visit and plan the base for it before we quote.
Our house is far back from the road. Can the concrete truck reach the backyard?
We plan that on the site visit. We walk the route from the road to the patio and work out how the concrete gets there. Access is one of the things that sets the price, so it is in the written quote, not a surprise on the day.
How much does a concrete patio cost in King?
Size, the finish you pick, the base the ground needs, and how easily the concrete reaches the patio set most of the price. Multiple levels add to it. We do not post a flat number, because it would mislead you. You get a free written quote after a site visit, and the number on the quote is the number you pay unless you change the job.
Is there a limit on how much of my King village lot can be paved?
For a single-detached or semi-detached house in one of King's villages, the Township's Site Alteration By-law caps hard landscaping at 60 per cent of the lot, and 80 per cent for townhouses. Ask the Township how your lot counts before you settle on a patio size. An exemption exists, but it needs stamped plans from a qualified professional.
When should I book a King patio?
As early as you can. King jobs go into planned trips with dates set ahead, so a spring request gives you the best chance of a patio that is ready for summer. We reply to every request within one business day.
What does the lifetime warranty cover on a patio?
It covers our workmanship: the site preparation, the base, the pour and the finishing, and repairs needed because that work was done wrong. It lasts as long as you own the home where the work was done. Normal wear, hairline cosmetic cracks, impact or chemical damage, and use before cure against our guidance are not covered.
Keep reading
- Concrete Patios across Southern OntarioThe full patio method: mix, base, slope, joints and cure.
- Concrete Contractors in King TownshipEverything else we do across King City, Nobleton, Schomberg and the estate country, from long approach driveways to barn pads.
- Basement Waterproofing in King TownshipIf an older King farmhouse wall already lets water in, fix that before a patio goes in beside it.
- Concrete Walkways & StepsA path from the patio to the door, poured the same day, sharing the truck and the base crew.
- Concrete Patios in Richmond HillThe same moraine sand, on suburban and new-survey lots to the east.
- Concrete Removal & Demolition in King TownshipAn old patio or walkway slab that has tipped on King sand comes out first, and the base is rebuilt before the new pour.
- Concrete Slabs & Garage Pads in King TownshipGarage, workshop and barn pads on the same moraine sand, with the base contained and compacted.
Tell us about the job.
Send the details and we'll get back to you within one business day with next steps. If water is coming in right now, check the box and we flag it urgent.
Get a straight quote
Free · no pressure · 1 business day




























