
HomeServicesConcrete DrivewaysOshawa
Concrete Driveways in Oshawa
We pour new, wider and replacement concrete driveways across Oshawa. In the older south end the job is usually tear-out and a proper base under a tired slab. In the north-end surveys around Windfields and Kedron it is often a first concrete driveway or a wider one on clay-loam till, sometimes with a City curb cut. Union-certified crews, a free written quote that holds, and a lifetime warranty on labour.
Get a straight quote
Free · no pressure · 1 business day
Reviewed June 2026
Every job is priced individually, not off a price list. Tell us about yours and you get an accurate, no-pressure quote in writing.
Oshawa changes as you climb away from the lake, and so does a driveway. The south end sits on the old Lake Iroquois shoreline plain of washed sand and clay, with a high water table near the harbour and the city's oldest housing. North of the old shoreline bluffs the ground turns to clay-loam till, and the homes in Windfields, Kedron and the Taunton growth are new. See our Oshawa page for everything else we do in the city.
Every driveway we pour gets the same core: excavation to stable ground, a compacted Granular A base, 32 MPa air-entrained concrete for freeze-thaw and road salt, and saw-cut control joints. The full spec is on our concrete driveways page. This page covers what Oshawa ground, Oshawa homes and Oshawa rules change about the job.
South Oshawa: tear-out and a real base
Many driveways on the lakeshore and central streets, around Lakeview, McLaughlin, Vanier and behind downtown, are on their second or third life. A driveway poured decades ago rarely got the base depth we use now, and Oshawa clay heaves wherever frost reaches under a thin slab. Once whole panels have lifted, we break out the old slab, haul it away, and fix the base before we pour.
With the water table high near the harbour, we also look at where water goes: the slope of the driveway, the downspouts that empty onto it, and whether melt runs toward the house or the garage. We grade the new slab so water runs off it and away from the foundation. If the basement already takes on water, see basement waterproofing in Oshawa.
North Oshawa: new lots, wider driveways and the curb cut
In Windfields, Kedron, Samac and along the Taunton corridor, the common ask is a first concrete driveway or a wider one. The clay-loam till up there heaves when frost reaches under a slab, and the ground on a new lot keeps shifting for a season or two after the build.
Width has limits. The City of Oshawa says a driveway must meet its Zoning By-law and cannot be more than 50% of the front yard area.
If a wider driveway needs a wider opening at the street, that is a curb cut. You ask Service Oshawa for it, the City visits the site, and once you pay the permit fee, a contractor the City hires cuts the curb. The City reviews curb cuts only from April 1 to November 30 and does not give a timeline, so we plan the pour around the curb cut, not the other way round.
Oshawa's driveway rules, before the forms go in
Before the forms go in, check the City's rules. The City asks that parking be on your own property, not the boulevard, and sets the parking space size for a house at 5.75 m by 2.75 m. Any new or wider driveway also has to sit 1 m away from above-ground utilities, such as a hydro pole or a pedestal box.
Trees matter too. If the new edge falls within 2 m of a City tree, or inside its dripline (the ground under the outermost branch tips), the City sends Forestry Services to inspect before anything is approved. Measure that before you fall in love with a width.
Grading has its own rule. Under the Site Alteration by-law, the ground within 0.6 m of the property line cannot be raised or lowered without a Site Alteration Permit, and a swale or ditch that drains the land cannot be moved or changed. We lay out the slope of the new slab with that line in mind.
Booking an Oshawa driveway
Oshawa is the far east end of the GTA from our southwest Ontario routes. We book Oshawa driveways into planned trips east along the lakeshore and give you a real date, not a same-week promise. A new slab needs vehicles kept off for at least 48 hours, and heavy trucks off for a full week, so plan the pour around when you need the car. We reply to every request within one business day.
Getting a curb cut done, step by step
A curb cut request goes to Service Oshawa, and the City needs at least 10 business days to review it. Every request gets a site visit, and the spot for the cut has to be clearly staked or marked so the inspector can see it. If it is approved, Road Operations emails the length of the approved cut, the cost and a payment link, and the City's contractor is told to proceed only once payment is in.
Two cautions. A horizontal cutting machine makes an even cut through the full thickness of the curb, but the City does not guarantee a 100% match with the existing depressed curb. And if your street is a Regional Road, the City does not handle the request, so confirm who owns the road before you apply. Because requests received after November 30 wait until the next season, we suggest filing early in the year if you want the pour done the same summer.
Straight answers
Do I need the City's OK to widen my driveway in Oshawa?
For the curb, yes. A wider opening at the street is a curb cut, and you request it from Service Oshawa; the City visits, you pay a permit fee, and the City's contractor cuts the curb. Curb cut reviews run from April 1 to November 30 only. The driveway itself must meet the Zoning By-law and stay under half of the front yard.
Our south Oshawa driveway has heaved and cracked. Repair or replace?
It depends on the base and how far the cracking has gone. If the slab is otherwise sound, a repair or resurface can buy years. Once whole panels have lifted, we tear out and haul away the old slab, fix the base, and pour new on a compacted Granular A base graded to drain away from the house. Tear-out and disposal are in the written quote.
We just moved into a new build in Windfields. When can we pour a concrete driveway?
Usually after the lot has settled and you can see how water runs across it, often after the first spring. North Oshawa clay-loam till keeps shifting for a season or two after a build.
How much does a concrete driveway cost in Oshawa?
Size sets the floor, then the finish, the base the ground needs, access, the time of year, and whether an old slab has to come out. A curb cut is a separate City fee. We do not post a flat rate that would only mislead you. You get a free written quote after a site visit, and the number on the quote is the number you pay unless you change the job.
How far can I widen my driveway in Oshawa?
The driveway cannot be more than 50% of your front yard area, so that half stays landscaped, and it must meet the Zoning By-law. It also has to stay 1 m away from above-ground utilities. Send us your lot, or let us measure at the free site visit, and we will tell you what fits before you commit.
Can I park on the boulevard instead of widening?
No. The City's Boulevard By-law requires parking on private property, not the boulevard. If you need more room for cars, a properly widened driveway is the route.
A City tree stands near my driveway. Does it stop the job?
Not always, but it adds a step. If the widened driveway comes within 2 m of a City tree or inside its dripline, you contact Service Oshawa and Forestry Services inspects before approval.
How long does a curb cut take in Oshawa?
The City needs at least 10 business days just to review the request, then a site visit, then payment, then its contractor cuts the curb. It does not guarantee timelines for that last step. Reviews run from April 1 to November 30, so we line the pour up with the cut.
Do I need a permit to regrade near my property line?
If you change the ground level within 0.6 m of the property line, or move a swale or ditch that drains the land, you need a Site Alteration Permit from Engineering Services. We work to keep the new slab's grading inside the rules.
Keep reading
- Concrete Driveways across Southern OntarioThe full spec: mix, base depth, joints, finishes and cure times.
- Concrete Contractors in OshawaEverything else we pour and repair across Oshawa, from the lakeshore streets to the north-end surveys.
- Concrete Driveways in AjaxWest along the Durham lakeshore: the same shoreline split, with Ajax's own curb cut rules.
- Concrete Removal & DemolitionReplacing an old driveway starts with tear-out and disposal.
- Concrete Removal & Demolition in OshawaAn old Oshawa driveway comes out first: what the lakeshore sand and north-end clay change about the tear-out.
- Concrete Repair & Resurfacing in OshawaIf the slab is still sound, crack repair or a resurface can buy years before a replacement.
- Concrete Slabs & Garage Pads in OshawaA garage or shed pad on Oshawa ground, with the City's shed rules checked first.
- Concrete Walkways & Steps in OshawaThe path from the new driveway to the door: what Oshawa clay and sand change about steps and walks.
Tell us about the job.
Send the details and we'll get back to you within one business day with next steps. If water is coming in right now, check the box and we flag it urgent.
Get a straight quote
Free · no pressure · 1 business day




























