
HomeServicesConcrete Slabs & Garage PadsAurora
Concrete Slabs & Garage Pads in Aurora
We pour shed pads, hot tub pads and detached garage slabs for Aurora homes, from the newer Bayview surveys to the estate lots in the south end. Aurora sits on Oak Ridges Moraine sand, which drains fast but will not hold a base on its own, so every pad gets a contained, compacted granular base before any concrete goes in. Union-certified crews, a free written quote, and a lifetime warranty on labour.
Get a straight quote
Free · no pressure · 1 business day
Reviewed June 2026
Every job is priced individually, not off a price list. Tell us about yours and you get an accurate, no-pressure quote in writing.
A pad lives or dies below the surface. In Aurora that surface is moraine sand and gravel, not clay. Water drains straight through it, so frost lifts a slab here less than it would on clay a few concessions south. The catch is the sand itself: if the granular under a pad is not contained and compacted, it migrates and the slab settles unevenly.
The full build, the 32 MPa air-entrained mix, the compacted Granular A base, mesh or rebar by load, is on our concrete slabs and garage pads page. This page covers what Aurora's ground and homes change. The site visit and the written quote are free, and the number on the quote is the number you pay.
Moraine sand and a floating pad
A detached garage pad in Southern Ontario is usually a floating slab, with no deep foundation, so the whole pad rides any ground movement as one piece. On Aurora's sand that makes the base the most important part. We dig to stable ground, compact the granular base in lifts, and thicken the edges where the walls will sit.
Because the sand drains so quickly, the base also has to stay put. We contain it at the edges so it cannot wash or creep out from under the slab. We read your ground at the free site visit and put anything it changes in the written quote.
Low pockets near the Holland River headwaters
The east branch of the Holland River rises just south of town, and the moraine feeds its headwaters. In the low pockets near the stream valley and the wetlands the water table runs high. A pad there needs a base that drains and a surface sloped so water leaves it, even though the higher sand around town stays dry.
Newer surveys and estate lots: the pad the builder left out
In Bayview Northeast and the Bayview Wellington surveys, builders pour the garage strip and leave the extras to the owner. A hot tub pad has to be dead level and reinforced for the load, because a filled tub with people in it weighs two to three tonnes. We pour it a little larger than the tub's footprint so steps and service panels land on concrete.
The estate lots in the south end have room for a detached garage or shop. That is a bigger pour with more steel, so we walk the lot first. Our Aurora page covers the rest of the flatwork we do in town.
What goes into an Aurora pad quote
Size is the obvious factor. Thickness, steel and the base come next: a garage or shop floor carries a vehicle, so it is thicker and heavier-reinforced than a shed pad.
Access matters too. A pour behind a narrow side yard, or a lot where the truck cannot get close, takes more labour to place and finish. We measure all of this at the free site visit and write it into the quote. The number on the quote is the number on the invoice unless you change the job.
Curing: when you can drive on it and build on it
A finished pad is not ready the day it is poured. Vehicles can go on a garage slab after 48 hours at the minimum, framing can start after about 7 days, and the concrete reaches its full design strength at 28 days. We give you plain instructions for the first week of cure and keep them short.
If you plan to put a shed, workshop walls or a hot tub on the pad, tell us at the visit. Anchor bolts and thickened edges are set before the pour when the building plan calls for them, and they go in the written quote up front.
Shed, hot tub or garage: choosing the pad
A light resin shed can sit on a compacted gravel pad, and we say so at the visit. Concrete earns its cost once the building holds tools, a workbench or a vehicle, or needs anchoring against wind.
A hot tub is the opposite case: a small footprint that carries a great deal of weight. The pad is poured level, reinforced for the load and slightly larger than the tub. A detached garage is a floating slab with thickened edges, a 10M rebar grid and a slab 125 to 150 mm thick. Pouring a walkway or apron on the same day can spread the fixed cost of a small pour across more concrete.
Garage floors, sheds and permits
A shed pad takes welded wire mesh. A garage or shop floor carries a vehicle, so it gets a 10M rebar grid at a 400 mm spacing and a slab 125 to 150 mm thick. A light resin shed does fine on a compacted gravel pad, and we will say so at the visit rather than sell concrete you do not need.
Most detached garages need a building permit, and the cutoff for sheds varies by municipality. We flag which side your project lands on at the site visit. Aurora is a planned-route town for us, so we group jobs into trips and book them on set dates rather than promising a truck the same day.
Straight answers
Does Aurora's sandy ground change how you build a garage pad?
It does. The Oak Ridges Moraine sand drains fast, so frost is less of a worry than on clay, but loose sand will not hold a base by itself. We contain and compact the granular so the slab does not settle unevenly.
My lot is in a low spot near the Holland River headwaters. Is that a problem for a pad?
It changes the base. The water table runs high in the low pockets near the stream valley, so the pad needs a base that drains and a surface sloped away. We check the lot at the free site visit.
Do I need concrete for a shed in Aurora, or will gravel do?
A light resin shed does fine on a compacted gravel pad, and we will tell you so. Concrete is the right answer once the shed is a workshop, stores anything heavy, or needs anchoring against wind.
How much does a concrete garage pad cost in Aurora?
Size, thickness, the reinforcement the load needs, access to the site and the base the sand needs all move the number. A garage floor costs more than a shed pad because it is thicker and carries more steel. We give you a written quote after a free site visit, and the number we give you is the number you pay.
How long before I can park in my new garage in Aurora?
Vehicles can go on the slab after 48 hours at the minimum. Framing can start after about 7 days, and the concrete reaches full design strength at 28 days. We give you plain cure instructions with the job.
Can you pour the pad with anchor bolts or thickened edges?
Yes. Anchor bolts and thickened edges are set before the pour when the building plan calls for them, and they are named in the free written quote so nothing surprises you mid-job.
What should I have ready for the site visit in Aurora?
Know what is going on the pad and roughly where, and tell us about any low or wet spots on the lot. We measure, read the ground and give you options and a written number at no charge.
Keep reading
- Concrete Slabs & Garage Pads across Southern OntarioThe full build: mix, thickness, reinforcement, base, anchors and cure times.
- Concrete Contractors in AuroraEverything else we pour and repair in Aurora, from the heritage core to the Bayview Northeast surveys.
- Concrete Driveways in AuroraThe same moraine sand under a driveway.
Tell us about the job.
Send the details and we'll get back to you within one business day with next steps. If water is coming in right now, check the box and we flag it urgent.
Get a straight quote
Free · no pressure · 1 business day




























