
HomeServicesConcrete Removal & DemolitionSmithville
Concrete Removal & Demolition in Smithville
My Concrete Pros breaks out, hauls and recycles old driveways, patios, walks, steps and pads in Smithville and the rest of West Lincoln, as its own job or as day one of a new pour. Two local things shape the job: the tight Haldimand clay under the town, and the Township's site alteration rules, which cover changing grade or removing topsoil. We order the utility locates, saw-cut the edges that stay, and itemize the tear-out on a free written quote. When we pour the new concrete, that work carries our lifetime warranty on labour.
Get a straight quote
Free · no pressure · 1 business day
Reviewed June 2026
Every job is priced individually, not off a price list. Tell us about yours and you get an accurate, no-pressure quote in writing.
Smithville is the seat of the Township of West Lincoln, and a tear-out here rarely looks like one in the city. A brick house near the 1903 train station may have a front walk and steps older than the owners. A farm lot out on a concession road may have an approach that has outlived its trucks. See our Smithville page for everything else we do in town.
The method is set out on our concrete removal and demolition page. This page covers the parts that are particular to Smithville: the clay, the creek, and the Township's rules on moving earth.
Tight clay, and what we do about the hole it leaves
The ground under Smithville is the Haldimand clay plain, the flat, slow-draining clay that runs south of the escarpment. It holds water long after the snow goes. A slab that lifted on it was often failing from the base up, so we dig out the soft, wet layer to firm ground before anything goes back.
A hole left open in this clay fills with water after rain. So we plan the tear-out and the rebuild as one job: break out, dig to solid ground, then compact granular base in lifts. If the slab is gone for good, we grade the area to shed water and finish it with gravel or topsoil.
Twenty Mile Creek and the high water table
Twenty Mile Creek runs through the middle of town, and the water table sits high on the flats near it. We check for water when the old slab comes up and plan the base and drainage around it.
West Lincoln's rules on moving soil
The Township of West Lincoln has a Site Alteration By-law. It covers placing or dumping fill, removing topsoil and changing the grade of land, and the Township asks for a Site Alteration Permit for those. A plain slab tear-out is not that, but a tear-out that also lowers a yard, regrades a lot or removes loads of earth can be. We ask about the grade at the visit and say so at the quote if a permit looks likely.
Utility locates are required by Ontario law before any digging, and we order them as part of the job. If a new driveway changes its width or its curb cut, the Township wants a say before the pour, and we flag that at the quote.
Old streets, new lots, farm lots
Around the downtown core and the station, old concrete often butts up against steps, a foundation or a neighbour's fence that stays. We saw-cut those edges so they stay clean, and a backyard behind a narrow gate means the smallest machine or hand breakout.
In the new west-side surveys the soil is disturbed backfill, so a new base there is compacted mechanically. On a farm lot, a heavy slab on a deeper base is its own build, and the tear-out shows what is under the old one.
Tear-out and new pour with one crew
A tear-out is often day one of a replacement: an old driveway out before a new concrete driveway in Smithville, or a heaved patio out before a new concrete patio in Smithville. One crew does both, so you pay one mobilization, and the base is rebuilt by the people who pour on it. If a wall beside the old slab lets water in, we can also look at basement waterproofing in Smithville while the ground is open.
Straight answers
Our driveway in Smithville has heaved. Do we need a full tear-out?
It depends on why it moved. On clay, heaving can come from a base that failed under the slab, and new concrete poured over a failed slab copies its movement. We look at the base at the visit. If the slab is sound and only the surface is tired, resurfacing may be the better answer, and we will say so.
How much does concrete removal cost in Smithville?
The slab's thickness, how much rebar or mesh is in it, and how a machine reaches it set the number. A driveway open to the street is the easy case; a backyard behind a narrow gate takes longer. We do not post a figure, because it would mislead you. You get a free written quote after a site visit, with breakout, hauling, disposal and grading itemized.
Do I need a permit to remove a driveway or patio in Smithville?
Removing flatwork normally needs no building permit. West Lincoln does have a Site Alteration By-law for placing fill, removing topsoil or changing the grade of land, so tell us if the yard will be regraded and we will say whether a permit is likely. Utility locates are required by Ontario law before any digging, and we order them.
Does it matter that my Smithville lot is near the creek?
It can. The water table is high on the flats near Twenty Mile Creek, so we check for water when the old slab comes up. Tell us the lot at the first call and we will plan the base around it.
What happens to the old concrete?
Clean concrete goes to a recycler and is crushed into road base. Mesh and rebar are cut free and recycled separately. Nothing gets buried on site.
Keep reading
- Concrete Removal & Demolition across Southern OntarioThe full method: locates, saw cuts, breakout, hauling and grading.
- Concrete Contractors in SmithvilleEverything else we pour and repair in Smithville and West Lincoln.
- Concrete Driveways in SmithvilleA tear-out often comes before a new driveway. How we build one on West Lincoln clay.
- Concrete Patios in SmithvilleA new patio on a rebuilt base, once the old slab is out.
Tell us about the job.
Send the details and we'll get back to you within one business day with next steps. If water is coming in right now, check the box and we flag it urgent.
Get a straight quote
Free · no pressure · 1 business day




























