My Concrete Pros(289) 778-5520Get a Free Quote
A freshly parged concrete foundation wall, Oshawa, Ontario

HomeServicesPargingOshawa

Parging in Oshawa

We re-parge the exposed foundation band on Oshawa homes: the grey strip of mortar above grade that cracks, sounds hollow and comes off in sheets. We strip it back to sound material and bond the new coat so it stays. The quote is free and written, and the labour carries a lifetime warranty.

Get a straight quote

Free · no pressure · 1 business day

We use these details only to respond to your quote request. Privacy Policy.

  • A residential concrete driveway, Southern Ontario
  • A backyard concrete patio, Southern Ontario
  • Stamped decorative concrete, Southern Ontario
  • A concrete walkway, Southern Ontario
  • A poured concrete slab, Southern Ontario
  • A finished concrete driveway, Southern Ontario
  • A concrete foundation wall, Southern Ontario
  • A concrete patio, Southern Ontario
  • Concrete work in progress on a jobsite, Southern Ontario
  • A residential concrete driveway, Southern Ontario
  • A concrete walkway and steps, Southern Ontario
  • Stamped and coloured decorative concrete, Southern Ontario
  • A finished concrete slab, Southern Ontario
  • A finished concrete patio, Southern Ontario
  • A concrete driveway at a home, Southern Ontario
  • A freshly screeded concrete slab, Southern Ontario
  • A residential concrete walkway, Southern Ontario
  • A poured concrete pad, Southern Ontario
  • A finished concrete driveway, Southern Ontario
  • A backyard concrete patio, Southern Ontario
  • A concrete foundation wall, Southern Ontario
  • Concrete forms set on a jobsite, Southern Ontario
  • A concrete patio, Southern Ontario
  • A stamped decorative concrete patio, Southern Ontario
  • A concrete walkway, Southern Ontario
  • A poured concrete slab, Southern Ontario
  • A residential concrete driveway, Southern Ontario
  • Poured concrete steps, Southern Ontario
  • A finished concrete edge on a jobsite, Southern Ontario

Reviewed June 2026

Every job is priced individually, not off a price list. Tell us about yours and you get an accurate, no-pressure quote in writing.

Oshawa is a car town. It grew from the McLaughlin Carriage Company in 1876 into General Motors of Canada in 1918, and the auto money of those years built much of the older housing near the lake. Many of those lakeshore and central homes still stand on their original foundations.

A coat applied decades ago has had a long run of Oshawa winters, and a wall that is cracked, hollow or gone in patches needs stripping back to sound material.

The full method, from bonding agent to coat thickness to mesh, is on our parging page. This page is about the two kinds of Oshawa wall we see, and what each one asks of a new coat.

Old lakeshore and central streets

Lakeview, downtown, the established blocks of McLaughlin and Vanier and the heritage pockets of O'Neill near Parkwood Estate all lean toward repair. The south end sits on the old glacial Lake Iroquois shoreline, a plain of washed sand and clay where the water table runs high near the harbour. The shoreline bluffs can still be read north of Highway 401, around Grandview Street and Ridgemount.

Houses below that line were built before walls were sealed to a modern standard, so spring melt and heavy fall rain press on the foundation. Water that gets behind the parging and freezes lifts the coat away from the wall. If you see a damp basement along with failing parging, the water may be coming through the wall below grade. Parging only covers the band above grade, so we look at both before we quote.

Newer north-end homes

Away from the lake the ground turns to clay-loam till. The family subdivisions around Windfields, Kedron and the Taunton corridor are newer. Clay holds water against a foundation wall long after the snow goes, and road salt and freeze-thaw swings work on the coat each winter. We look at the wall, say what is wrong and give you a free written quote.

What the repair involves on an Oshawa wall

We sound the whole exposed band by tapping it and strip every hollow or loose patch back to solid material. Then we clean off dust and old paint, dampen the wall and apply a bonding agent. Fibreglass mesh goes over patches, filled voids and changes in material, where the coat crosses them.

The coat goes on a quarter to three-eighths of an inch thick, in two passes on a rough wall. We do not paint over a failing coat, because paint holds moisture in and the next freeze works underneath it.

Booking a job in Oshawa

Oshawa is at the far east end of the GTA, well past Toronto from our southwest Ontario routes. We fold Oshawa jobs into planned trips east along the lakeshore and give you a real date, not a same-week promise.

Questions

Straight answers

My parging is coming off in sheets. How urgent is that?

Water behind the coat freezes and lifts whole sheets off the wall, so more comes away each winter. A re-parge is a small job. We strip everything loose, bond the new coat and give you a written quote.

Why is the parging on my Lakeview or downtown Oshawa house crumbling?

Homes on the old lakeshore plain were built before walls were sealed to a modern standard, and spring melt and fall rain press on the foundation. Water that gets behind the coat and freezes pushes it off. We strip back to sound material and bond a fresh coat so it holds.

What does parging cost in Oshawa?

We do not quote a flat rate. The quote spells out the prep work, not a one-line "parge wall". The visit and the written quote are free, and the number on the quote is the number on the invoice unless you change the job.

Can I just paint over the crumbling parging?

No. Paint seals moisture in instead of out, and the next freeze works underneath where you cannot see it. Plan on stripping back to sound material before anything new goes on.

Keep reading

Tell us about the job.

Send the details and we'll get back to you within one business day with next steps. If water is coming in right now, check the box and we flag it urgent.

Get a straight quote

Free · no pressure · 1 business day

We use these details only to respond to your quote request. Privacy Policy.

CallGet a Free Quote